Pressure Adjusting Station Replacement

BACKGROUND

The Village of Bensenville started receiving Lake Michigan water from the DuPage Water Commission in May 1992. The entry point for the potable water obtained from DuPage Water Commission Station is located at 130 N. Church Road. The Village has one Pressure Adjusting Station (PAS), which accepts water from the DuPage Water Commission at 120 PSI and then reduces pressure to 60 PSI. The water is pumped and conveyed from the PAS to the Bensenville Community Water System system and storage facilities. The PAS distributes approximately 500 million gallons of water a year. 

This facility was constructed in 1990, and all the equipment and components are nearing the end of their service lifecycle. The current facility is a subgrade facility with accessibility issues due to its confined space classification. Moisture issues make the environment unsuitable for mechanical components, creating a corrosive environment for all equipment and components.  

SCOPE OF WORK

Site work 
Pressure Adjusting Station Modernization
  • Demolition 
    • Existing PAS structure
    • Pavement removal 
      • Concrete driveway/walkway
    • Chemical feed building
    • Motorola building
  • New water piping connections to existing PAS and Pump House Facilities and DuPage Water Commission Metering Facility
  • Install water distribution piping
  • Install storm sewer piping
  • New electrical service
  • Install new electrical conduit
  • Parking lot improvements
  • Turf restoration
  • New PAS structure
  • New mechanical and equipment components in PAS
    • Above-grade pipe gallery
    • Process System Metering System
    • Altitude Adjusting System
    • Surge Release System
    • Electrical and instrumentation controls
    • Chemical injection system
    • Natural gas backup generator
    • Telecommunication upgrades
  • Replacement of the existing pump station roof


Project Details

Contract Bid Date: October 17, 2023
Contract Award Date: December 12, 2023
Project Cost: $8,551,437.00
Awarded Contractor: Willaims Brothers Construction 
Construction Start Date: June 2024
Construction Completion Date: August 2026
Funding Sources: Capital Improvement Funds/IEPA loan

Project Contact Information

Village of Bensenville Project Contact
Vincent Smith  Helen Yeung
Assistant Director of Public Works  Greeley and Hansen
Email: Vsmith@bensenville.il.us
Email: Helen.yeung@tylin.com
Phone: 630-350-1196 Phone: 773-630-5818

Project Documents

Name Link to Document
(Future links to PDFs to be placed here)
View


Project Updates

(Future weekly updates to be started here.)